990
Response to a Load Tender
What is the Purpose of The EDI 990 - Response to a Load Tender?
The EDI 990 serves as the carrier's acceptance or rejection response to a Motor Carrier Load Tender (EDI 204), following their review of the tender details.
What are the important elements of The EDI 990 - Response to a Load Tender?
The EDI 990 (Response to a Load Tender) is a standardized electronic document used to respond to freight transportation load tenders. Here are the key elements: 1. Header Information: - Response Reference Number - Response Date/Time - Original Tender Reference - Transaction Type Code - Response Type - Status Code - Priority Code 2. Partner Information: - Carrier Information (name, ID, address) - Shipper Information - Tender Issuer Details - Pickup Location - Delivery Location - Additional Trading Partner IDs 3. Response Details: - Acceptance/Rejection Status - Response Reason Code - Alternative Proposals - Rate Confirmation - Equipment Commitment - Capacity Status - Service Level Agreement 4. Load Information: - Load Reference Numbers - Equipment Type - Equipment Size - Weight Details - Volume Information - Commodity Type - Special Requirements 5. Schedule Information: - Pickup Date/Time - Delivery Date/Time - Transit Time - Appointment Details - Equipment Availability - Loading/Unloading Times - Schedule Confirmation 6. Rate Information: - Accepted Rates - Rate Adjustments - Accessorial Charges - Fuel Surcharges - Total Charges - Payment Terms - Rate Validity 7. Reference Numbers: - Original Tender Numbers - Shipment Numbers - Bill of Lading Numbers - Authorization Numbers - Contract Numbers - Route Numbers 8. Additional Elements: - Special Instructions - Equipment Requirements - Driver Requirements - Insurance Information - Regulatory Compliance - Safety Requirements 9. Control Segments: - Transaction Set Control Numbers - Segment Counts - Hash Totals - Control Totals The EDI 990 is essential for coordinating freight transportation and confirming load tender details between shippers and carriers.
What are the potential issues with The EDI 990 - Response to a Load Tender?
Here are the potential issues that can occur with EDI 990 (Response to a Load Tender) transmissions: 1. Response Status Problems: - Incorrect acceptance/rejection status - Wrong response reason codes - Invalid alternative proposals - Missing rate confirmations - Wrong equipment commitments - Invalid capacity status - Missing service level agreements 2. Load Information Issues: - Wrong load reference numbers - Invalid equipment type - Missing equipment size - Incorrect weight details - Wrong volume information - Invalid commodity type - Missing special requirements 3. Schedule Information Problems: - Wrong pickup dates/times - Invalid delivery dates/times - Missing transit times - Incorrect appointment details - Wrong equipment availability - Invalid loading/unloading times - Missing schedule confirmations 4. Rate Information Issues: - Incorrect accepted rates - Wrong rate adjustments - Invalid accessorial charges - Missing fuel surcharges - Wrong total charges - Invalid payment terms - Missing rate validity 5. Reference Number Problems: - Missing original tender numbers - Invalid shipment numbers - Wrong bill of lading numbers - Incorrect authorization numbers - Missing contract numbers - Wrong route numbers - Invalid control numbers 6. Format and Structure Issues: - Missing mandatory segments - Invalid segment sequence - Wrong element usage - Incorrect qualifiers - Version/release mismatches - Character set problems - Wrong hierarchical structure 7. Equipment/Driver Requirements: - Wrong equipment specifications - Invalid driver qualifications - Missing insurance requirements - Incorrect safety requirements - Wrong regulatory compliance - Invalid certification needs - Missing equipment details 8. System Integration Challenges: - TMS system incompatibilities - ERP integration problems - Translation errors - Interface failures - Database synchronization - Data transformation errors - Mapping discrepancies 9. Trading Partner Issues: - Wrong carrier information - Invalid shipper details - Missing location codes - Incorrect contact information - Wrong processing rules - Invalid partner qualifiers - Missing communication details These issues can impact load tender response processing and require robust validation and error handling procedures.
Curious about other types?
More articles
Our platform is designed to empower businesses of all sizes to work smarter and achieve their goals with confidence.